Loading...

Resignalling Nuneaton to Coventry

UK | SECTOR: Rail

Atkins completed all signalling and civil engineering work in a major upgrade of the rail network in England’s West Midlands. It involved re-signalling the entire layout from Coventry to Nuneaton with modern interlocking equipment and moving control of the network to Rugby Signalling Control Centre.

Once the signalling design was sufficiently advanced, the design and build of the associated civil engineering works could commence. Atkins successfully demonstrated how a seamless relationship between signalling and civil engineering enabled this challenging project to succeed and be delivered on time.

Link to this project:

Share this on

  • Link to twitter – opens in a new window
  • Link to Facebook – opens in a new window
  • Link to LinkedIn – opens in a new window
  • Link to Google+ – opens in a new window
  • Email
  • You are currently viewing all our
    projects. Use the filter on the left to
    narrow down the showcase.

  • You are currently viewing all our
    projects. Use the filter on the left to
    narrow down the showcase.