Loading...

Flood Response

UK | SECTOR: Water

Atkins provided emergency response, maintenance works and minor improvements, construction management for major works as well as design, maintenance and work supervision for structures following torrential rain which led to the worst flooding Gloucestershire has seen for a generation.

Atkins worked with Gloucestershire County Council to secure £16 million grant funding to restore the network to its pre-flood condition. Atkins delivered a one year programme of flood repairs including 28 stabilisation schemes, 19 structural repair schemes for bridges, 334 lane kilometres of resurfacing and 733 minor works.

Link to this project:

Share this on

  • Link to twitter – opens in a new window
  • Link to Facebook – opens in a new window
  • Link to LinkedIn – opens in a new window
  • Link to Google+ – opens in a new window
  • Email
  • You are currently viewing all our
    projects. Use the filter on the left to
    narrow down the showcase.

  • You are currently viewing all our
    projects. Use the filter on the left to
    narrow down the showcase.